Drawing Coordination Review
A second set of eyes on someone else's structural set.
M-3.0 · Overview
We review calcs and drawings for load path issues, code compliance red flags, and constructability, and return a written memo.
M-3.1 · What you receive
01Written review memo
02Redline PDF
0330-min call to walk through findings